Tank engineering & consultancy A new tank farm with a capacity of 360,000 m3 and 13 tanks (Reformates, Jet A1, Diesel) was under construction to be implemented at a refinery in Turkey. Our engineering review included welding sequence,...
Catalyst change

Catalyst change

Catalyst change During a so-called turnaround, when the production process is shut down at a refinery, we carried out catalyst work. Together with Mourik International (main contractor) we have unloaded, cleaned, and inspected 3 Tubular reactors.
Yearly revision

Yearly revision

Annual overhaul With the deployment of more than 80 men, an entire production line was cleaned. This work took place over a period of 10 days, day and night. Activities included the removal of oxides from enclosed spaces and the...
Project management tank maintenance

Project management tank maintenance

Project management tank maintenance A 96.5-metre crude oil tank in the Caspian region was in need of repair. Repair included replacement of the annular plate, ring seal system and complete internal re-coat and commissioning activities. Successfully...