Annual revision

With the efforts of more than 80 men, an entire production line was cleaned. This work took place over a period of 10 days, continuously day and night. Activities included the removal of oxides from enclosed spaces and the removal of oil and grease. Of course, the work was carried out safely and responsibly within the set time.