Project management tank maintenance

A 96,5-meter crude oil tank in the Caspian region required a repair. Repair included replacement of the annular plate, ring seal system and full internal re-coat and commissioning activities. Our project team successfully guided the quality and construction process.

The main activities in the project were;

  1. Bottom, tank roof and wall integrity verification.
  2. Scope Challenge on inspection reports
  3. Wall and EFR structure evaluation for the sealing system
  4. Design of repair method.