Project management tank maintenance
A 96,5-meter crude oil tank in the Caspian region required a repair. Repair included replacement of the annular plate, ring seal system and full internal re-coat and commissioning activities. Our project team successfully guided the quality and construction process.
The main activities in the project were;
- Bottom, tank roof and wall integrity verification.
- Scope Challenge on inspection reports
- Wall and EFR structure evaluation for the sealing system
- Design of repair method.