Project management tank maintenance
A 96.5-metre crude oil tank in the Caspian region required repair. Repair included replacement of the annular plate, the ring seal system and complete internal re-coat and commissioning activities. Our project team successfully managed the quality and construction process.
The main activities in the project were;
- Soil, tank roof and wall integrity verification.
- Scope Challenge on inspection reports
- Wall and EFR structure evaluation for sealing system
- Design of repair method.