Project management tank maintenance

A 96.5-meter crude oil tank in the Caspian region needed a repair. Repair including replacement of the annular plate, ring seal system and full internal re-coat and commissioning activities. Our project team successfully guided the quality and construction process.

The main activities in the project were;

  1. Bottom, tank robbery and wall integrity verification.
  2. Scope Challenge on Inspection Reports
  3. Wall and EFR Structure Evaluation for the Sealing System
  4. Design of repair method.